Just noting that Skyler and I had a really productive chat yesterday which has resulted in the following three issues opened on the specification repo:
- #492 – schedule groups. This is likely a priority and can be handled many ways some of which would be appropriate for 3.1 and some would be more radical and should be considered for a 4.0 update.
- #493 – how should we model Events in the standard?
- #494 – redesigning
schedule
based on the outcome of the previous two discussions.
I’ll be speaking with Dan soon to get the first of these added to the project board since it’s a present need in the community and we can work to start addressing it.